3rd Line Extension, Syamala Nagar
Structure | Reinforced cement concrete frame work on footing over hard strata. | |
Walls | All outer walls are 9” thick & internal walls are with 4 ½ “ thick by using good quality clay bricks. | |
Plastering | Single sponge finished plastering for all internal and external walls. | |
Doors | Main Door & Internal Doors – Teak wood frame with teak wood shutters polish finish. Bathroom & Kitchen Doors are W.P.C Doors. | |
Windows | Teak wood frames, teak wood shutters with glass and MS Grills/UPVC Windows. | |
Flooring | Vitrified tiles in Living, Kitchen, Dining and Bed Rooms. Ceramic tiles in Toilets, Wash areas and Balconies. | |
Kitchen | Granite Platform / Tills dadoing up to 3’ height | |
Toilets | Ceramic tiles of premium quality up to 7ft height. One toilet with Indian W.C. and other with Europen W.C. | |
Plumbing | Concealed CPVC plumbing. One wall mixture of standard make. | |
Painting | Enamel paint for grills & wood work and white wash for internal walls | |
Electrical | 3 phase connection with concealed copper wiring (Finolex) with adequate points will be Provide, (Legrand) switches, Intercom facility from all flats to watchmen. | |
Telephones | Telephone, T.V and internet points in living, M.Bedroom will be provided. | |
Generator | Generator backup with sound proof enclosure. Connection for Lift common areas, 2 tube lights and 2 fans in each flat. | |
Lift | 4 Persons lift of std. make with 24 Hrs. Stand by Generator. | |
Cup-boards | Cement flanks finished with teakwood frames and nuwood shutters (Max.25% of plinth area.) | |
Parking | One Car & Bike Parking for each flat each flat will be Provided. | |
Note | 1. Municipal water deposit , Electrical connection deposit, Registration Charges, Labour cess, GST and any other Govt. charges to be borne by customer. 2. Any changes or alternations against above said specifications will be extra cost. |